Mandai Link Logistics Pte Ltd

Design & Engineering


25,000 MT Storage Capacity Refrigerated Warehouse Hub: * Fully automatic NH3 centralized refrigeration plant powered by 1x Economized Single Stage Sabroe compressors SAB151E with 100% stand-by. * Conversion of one of the two 80,000m3 Automated Storage & Retrieval System (ASRS) refrigerated bay from freezer (-22deg) to chiller (+2deg) room temperature.